University of Toronto Mississauga (UTM) Multi-Residence Demolition

Environmental
Quick Facts
Demolition team
Client
Dineen Construction Corporation
Services
Environmental/Demolition
Location
Mississauga
Year Complete
Ongoing
GALLERY
No items found.
SUMMARY

MGI completed the demolition of three existing residential buildings located on the University of Toronto Mississauga campus as part of the University's campus redevelopment initiatives. The project included the safe decommissioning and removal of all existing site services, including the septic system, as well as the location and removal of existing water service connections serving nearby properties. The work required careful planning, environmental controls, utility coordination, and safe demolition practices to prepare the site for future development while minimizing disruption to the surrounding campus environment.

other Works

More Case Studies

Have a look at some of our other projects.

Let’s Get in Touch

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form