MGI Construction Corp. performed major site servicing and wet utility works as part of the Downtown Brampton Flood Protection Project, a significant infrastructure program designed to support flood protection and the long-term redevelopment of Brampton’s downtown core. MGI worked under EllisDon Civil Ltd. as part of the broader program, which included channel reconstruction, bridge replacements, retaining walls, roadworks and landscaping. MGI’s scope included the installation and commissioning of approximately 378m of new 200 mm watermain, 484 m of storm sewer, sanitary sewer and associated manholes, catch basins, hydrants and related infrastructure, together with utility removals and surface restoration.